Search HoldMyTwist

Browse all posts

Is Make Free enough for your workflow?

Before you even get your flow, understand the limits of Make Free. Plan your monthly credits. What do you want to track?

Paper workshop with branching conveyor belts, spreadsheet trays, an hourglass and a limited bowl of tokens.

Free might be the way for that simple repetitive task. Use this worksheet to see if you can do it with Free or need to measure it or free isn't enough. You don't need to create an account to get your initial guess.

Before you start

For "build-in practice", you need Make Free account and browser. You'll create 1, 2 and 3. You will see the result. You will see used credits. No need to link anything to external app. Only start Make Free (opens in a new tab) or login to your account.

We may earn commissions from eligible Make paid subscriptions via links in this guide. We do not receive a commission for just a Free signup.

Scenarios = Workflows Module = Step within a workflow. Multiple credits may be used per run.

Consider checks, tests, and re-running in your budget.

1. Check the limits before counting credits

Make's Free version (opens in a new tab):

  • 1000 credits per month
  • 2 active scenarios
  • min interval for scheduled execution is 15min
  • max execution time is 5min
  • max file size is 5MB
  • 512MB transfer per monthly period
  • execution log is kept for 7 days

Pay attention to how many scenarios you need to keep active. Pay attention to how long you can let an item sit. If applicable look at file limits. Keep your trial notes before they drop old logs.

The min interval of 15min is for scheduled executions. There are some triggers where the can immediately react (opens in a new tab) to an incoming event. Make sure to look at the specific integration for that before you rely on that. They still have credit/service limits for an instant trigger.

If your source only has polling, and you need to poll it every 5min then no Free isn't up to that. It doesn't matter if you only have a few items. You're still constrained to that interval for the schedule.

2. Fill in your monthly budget

Use your make org allowance dates. Enter a fake time frame, say 30 days. You'll have to adjust the number of checks if its 31 days. Duplicate this worksheet:

Text to copy

Task and useful output: ___Budget period, including start and end dates: ___Maximum acceptable delay: ___Active scenarios needed, including existing ones: ___Trigger type and schedule: ___Expected checks or incoming events during this period: ___Expected items, including a busy-period estimate: ___Each module's name, observed operations and displayed credits in the trial: ___Credit projection for the candidate scenario, including trigger checks: ___Credits for other scenarios in the same allowance: ___Credits already used or planned for setup tests and repeat runs: ___Extra reserve I choose for variation and unexpected work: ___Total credits budgeted: ___Credits left from the 1,000-credit allowance: ___Limits passed, unknowns and my decision: ___

Add your workfow-estimation, credits for other scenarios, setup/repeat run credits and your reserve of choice. Take this sum from 1000. Add credits spent until mid-time of period, forecast only what's left to do. Don't doublecount trial or trigger.

Watch out

You set your own tolerance to ambiguity. It's not a Make requirement. It's not a guarantee that you won't run out of it.

What belongs in the candidate projection?

For most modules (if you're doing fixed rate) it's 1 credit per 1 operation (opens in a new tab) - some exceptions may exist (e.g. some AI modules and/or more advanced modules may use tokens/pages/file size/time to execute for example as pricing). Don't count the number of boxes in the canvas. Count based on the rules for the module and credits displayed.

Count operations based on the number of bundles (opens in a new tab) processed. Bundle is the data unit. Sometimes your trigger may be sending out more than one bundle. These extra bundles may result in additional operations. Also account for recorded branches and rejections.

For polling, also include when it finds nothing. They mention in Make's example of the schedule (opens in a new tab) for their example of polling once per hour for 30 days in Google Sheets it says for their example of polling once per hour in 30 days for Google Sheets you'll go through 720 trigger credits for it. This is before additional downstream actions. Recorded example but not recorded price for your scenario. Record an empty check and check with data in your own experiment before deciding on a polling frequency for your budget.

For variable costs, you should do some testing with small and large inputs. Record range. Try to set upper limit until you know what you want to choose as an estimate. If don't know - needs measurement. Certain apps connected and/or AI services may have some costs that aren't accounted in a budget at Make. You can't add costs to make budget.

3. Use the result to choose your next step

Filled example: a daily workflow with room to test

This is an example budget scenario showing a decision and providing some made up usage numbers (no actual HoldMyTwist integration cost numbers or module price for copy). The operation is a daily list of new item records. Waiting 1 day is okay, 1 active scenario is required, you expect to see 100 records over 30 days. No files. Example is based on other plan limits meeting these assumptions. Assume 2 credits for daily check trigger and other work done once per check. Plus 3 credits per record. Projected scenario candidate is 30 checks * 2 credits + 100 records * 3 credits = 360 credits. Reader use your actual trial credits measured and counts of execution. Also list additional branches or batch steps. For other scenarios allow 120 credits. Setup tests or repeat. Allow 40 credits. Reader selection of reserve 200 credits. 360 + 120 + 40 + 200 = 720 credits. Left over allowance is 1000 - 720 = 280 credits (with reserve included). This all fits with assumptions presented above, and doesn't promise you capacity to do another workflow. You will need to do some good measurement for your own empty checks & busy times to decide fit for yourself. If you don't have those measurements your decision is needs measurement.

Boundary example: 920 credits is not automatically a fit

So let's say your projection for candidate is 920 credits. And let's say you have another 60 credits for other scenarios. You are holding 100 credits as a reserve for tests and for changes. And you were supposed to spend 1080 credits. So you're 80 in the over. So you're just trying to work within the hypothectical budget here. These aren't numbers that are proven. So you either scale down the work. Or you have to find an acceptable change in schedule. Or paid plan. Just hold that necessary reserve.

Record your decision

  • fits : the budget can be contained in your plan (you respect the limits of your task), your measures of rep are relevant for your projection and the sum + your reserve is acceptable.
  • need measure : you don't know usage credit rate, empty check, busy batch mandatory feature ... or other scenario. What test you lack ? to choose ...
  • does not fit : mandatory limit not respected. Total budget exceeding the limit once you're done. So change the requirement or try another one.

This budget is realized with a spreadsheet or calculator. If it's a kind of task occasionally, manual or native from the source app may be sufficient. Otherwise if it's a kind of task to do often, think to the connections (or process in if you have access to make test for make).

4. Learn where to read credits in Make

This is already set up. to do some practice on using credits without integrating with another app. We set up a recorded repeater and set variable that cost 2 credits per single generated item and 4 credits for 3. Doesn't show what your integration cost is or empty poll.

  1. Create scenario. Create Scenario. Credit practice. Make it Inactive.
  2. Add Flow Control. Add Repeater. Set Initial value and Repeats to 1. Click show advanced settings. Set Step to 1. Save
  3. Add Tools. Add Set variable. Set Variable name to sample_number. Set Variable value to the green i token which you'll see in Flow Control 1 - Repeater. (Don't type the letter.) Save module. Save scenario.


Full Make editor showing Repeater with Initial value 1, Repeats 1 and Step 1.

Full Make editor showing Repeater with Initial value 1, Repeats 1 and Step 1.
Open full-size image

Full Make editor showing sample_number with its value mapped to the Repeater i token.

Full Make editor showing sample_number with its value mapped to the Repeater i token.
Open full-size image
  1. Then next to your scenario name click on Canvas options. Tick Show credit usage and close.
  2. Click Run once. In our run we had 1 operation and 1 credit on each module (2 credit in total). On Tools bubble operation 1 had output sample_number=1
  3. Close the inspector. Change Repeats to 3 and save. Click again Run once. In our run we had 1 operation and 1 credit for Repeater. Also 3 operations and 3 credits for Tools (4 credits in total).
  4. Check Tools operations. Our outputs were sample_number=1,2,3. Please record your results. Keep the practice Inactive.
If you are doing repeats of 3, then Repeater is 1 credit. Set variable is 3 credits. 4 credits for one single manual run.

Full Make editor after a three-item run, showing one credit for Repeater and three credits for Set variable.

Full Make editor after a three-item run, showing one credit for Repeater and three credits for Set variable.

If you are doing repeats of 3, then Repeater is 1 credit. Set variable is 3 credits. 4 credits for one single manual run.

Open full-size image

Full Make editor with the Set variable inspector showing three operations and sample_number 3 in the third output.

Full Make editor with the Set variable inspector showing three operations and sample_number 3 in the third output.
Open full-size image

Check Make Repeater (opens in a new tab) scenario variables (opens in a new tab) credit indicators (opens in a new tab) tutorials. If it's different save current shown usage please.

If you have i letter, please open again Set variable and select mapped token. If Tools only once time running at second test, set repeat to 3 and connect modules.

5. Measure the real task before relying on it

Try a safe test in the actual candidate. Observe the result. Note the credits used by each module. Including blank polling tests. Multiple items incoming. Safe retry/repeat tests. Do not mix test writes with real actions. Repeats can be made to repeat something in another app.

Do budget update after a busy day. Or after updating modules/schedules/input size. Manual tests also use the allowance.

If you get budget failure, first try to reduce checks. Or reduce work in each period. Or find a supported instant trigger. Test a new workflow after a change. Don't make a safe assumption about the saved budget. If you have a real need for more active scenarios. Or more frequent scheduled runs. Make Plan has unlimited active scenarios. Plus, 1 minute schedules. (opens in a new tab) Those paid features are not tested here. See the price/allowance/billing period right now before you pay.

Make claims that scenarios stop running when out of credits. (opens in a new tab) If you have a workflow that can not afford a pause. You need to select an appropriate plan. Plus, create a recovery process.

If you can afford your estimated workload in the allowance. Start with Make Free. (opens in a new tab) Test a harmless manual sample before scheduling. Compare the actual credit usage to your budget. Before deciding to pay.

Share this post